Let's talk

Fill out the form and our team will get back to you as soon as possible.

Thank you

Our team will contact you as soon as possible.
An error occurred while sending the form. Please refresh and try again.
  • Label
    Label
  • Panattoni for DPD

    The new sorting facility was built to increase capacity for handling growing shipment volumes and to streamline DPD's logistics processes in the Poznań region. Its location near the S11 and A2 provides a fast connection to the Poznań metropolitan area and the national transport network.

  • Tenant:
    DPD Polska
  • Investor - Developer:
    Panattoni
  • Architecture:
    TFK Poznań
  • General contractor:
    GOLDBECK
  • Location:
    Żerniki, Greater Poland Voivodeship
  • Total area:
    19,600 m²
  • Scope of work:
    architectural design, pre-development, environmental decision, building permit
  • The building layout was designed to prioritize the speed of courier operations — from parcel sorting to efficient transshipment and fleet management.

    The project included:

  • sorting system tailored to DPD processes
  • numerous ground-level courier bays
  • maneuvering areas ensuring efficient vehicle handling
  • functional layout optimized for rapid shipment flow
  • The project combined a courier sorting facility with a layout for rapid transshipment and fleet management. The sorting system, courier bays, and maneuvering areas were all designed to facilitate the efficient flow of shipments and vehicles.

    "Our goal is to deliver shipments safely, quickly, and efficiently."
    Rafał Nawłoka
    CEO of DPD Poland

    See our projects

    Elmark

    Go to case study

    Chefs Culinar

    Go to case study

    ELTEK

    Go to case study

    Panattoni dla DPD

    Go to case study

    Danfoss Grodzisk

    Go to case study

    Auchan

    Go to case study

    B144 Biurowiec

    Go to case study

    BSH

    Go to case study

    City Point

    Go to case study

    Greenpack

    Go to case study

    Auro

    Go to case study

    AJU Poland

    Go to case study

    Hermes

    Go to case study

    Southco

    Go to case study

    Danfoss Tuchom

    Go to case study

    SanoRice

    Go to case study

    Panattoni

    Go to case study

    IdealAutomotive

    Go to case study

    LPP

    Go to case study
    1/1