
Hermes
The first Hermes Fulfilment center in Poland was established to increase capacity for the European e-commerce market. A high level of automation streamlines order picking and shipping, while also reducing delivery times.

Investor:
OTTO Group
Developer:
Panattoni
Architecture:
TFK Poznań
General contractor:
GOLDBECK Poland
Location:
Konin Żagański, Lubusz Voivodeship
Total area:
250,000 m²
Scope of work:
architectural design, design coordination

The Hermes Fulfilment center in Iłowa is one of the largest OTTO Group logistics facilities in Europe.
Four-level mezzanines and automated systems support large-scale e-commerce operations.
The project included:
multi-level warehouse automation and sorting systems
four-level mezzanines increasing usable floor space
photovoltaic installation and an advanced BMS system
photovoltaic installation and an advanced BMS system
A multi-level, highly automated logistics center has been created to support European e-commerce. Nine halls, extensive mezzanines, and automation systems have made it possible to combine a very large usable area with rapid goods flow and the potential for further efficiency gains.
"The first logistics center in Poland is a turning point for our operations in Europe."












.jpg)

.jpg)
.jpg)


