Let's talk

Fill out the form and our team will get back to you as soon as possible.

Thank you

Our team will contact you as soon as possible.
An error occurred while sending the form. Please refresh and try again.
  • Label
    Label
  • Greenpack


    The facility is designed for the packaging and distribution of fresh vegetables, tailored to a specific technological process.
    The functional layout was designed to support efficient product flow, packaging line operations, and internal logistics, while also meeting specific storage requirements.                     

  • Investor:
    Greenpack Maasdijk
  • Architecture:
    TFK Wrocław, TFK Poznań
  • General contractor:
    Depenbrock Polska
  • Location:
    Legnica, Lower Silesian Voivodeship
  • Total area:
    20,100 m²
  • Scope of work:
    environmental decision, building permit, water-legal permit, executive design
  • From concept to completion in 14 months.

    We were responsible for the design process -
    from concept development to construction supervision.

    The project included:

  • functional layout of logistics and warehouse processes
  • proper storage conditions for fresh vegetables
  • heating and cooling system based on air-source heat pumps
  • energy efficiency solutions
  • A modern logistics and warehouse facility has been built, tailored for the distribution of fresh products. The technical solutions implemented reduce fossil fuel consumption and support the facility's efficient operation.

    Greenpack's Legnica location supports sustainable logistics and increases supply chain flexibility.
    ‍
    ‍

    See our projects

    Elmark

    Go to case study

    Chefs Culinar

    Go to case study

    ELTEK

    Go to case study

    Panattoni dla DPD

    Go to case study

    Danfoss Grodzisk

    Go to case study

    Auchan

    Go to case study

    B144 Biurowiec

    Go to case study

    BSH

    Go to case study

    City Point

    Go to case study

    Auro

    Go to case study

    AJU Poland

    Go to case study

    Hermes

    Go to case study

    Southco

    Go to case study

    Danfoss Tuchom

    Go to case study

    SanoRice

    Go to case study

    Panattoni

    Go to case study

    IdealAutomotive

    Go to case study

    LPP

    Go to case study
    1/1