Let's talk

Fill out the form and our team will get back to you as soon as possible.

Thank you

Our team will contact you as soon as possible.
An error occurred while sending the form. Please refresh and try again.
  • Label
    Label
  • Elmark

    Panattoni Park Szczecin III is a complex of two industrial and warehouse buildings with a total area of over 30,000 m². The project combines flexible solutions for logistics and light manufacturing with high environmental standards.

  • Investor:
    Elmark Automatyka
  • Architecture:
    TFK Poznań we współpracy z Bidermann+Wide
  • General contractor:
    wnętrza biurowe
  • Location:
    Szczecin, West Pomeranian Voivodeship
  • Total area:
    30,238 m²
  • Scope of work:
    architectural design
  • This is the first newly constructed industrial facility in Poland to achieve BREEAM International New Construction certification at the Outstanding level, with a score of 87.4%.

    The project included:

  • flexibility for future changes in building function
  • solutions to reduce water and energy consumption
  • comfort, accessibility, and a safe traffic layout for employees
  • greenery, biodiversity, and infrastructure for bicycles and electric vehicles
  • We have created a flexible industrial and warehouse park designed to support various business models and future changes in usage. Environmental, functional, and social solutions have enabled us to achieve the highest level of BREEAM certification.

    "A mutual understanding of green building concepts allows us to deliver increasingly sustainable facilities."
    Elmark Automatyka
    ‍

    See our projects

    Chefs Culinar

    Go to case study

    ELTEK

    Go to case study

    Panattoni dla DPD

    Go to case study

    Danfoss Grodzisk

    Go to case study

    Auchan

    Go to case study

    B144 Biurowiec

    Go to case study

    BSH

    Go to case study

    City Point

    Go to case study

    Greenpack

    Go to case study

    Auro

    Go to case study

    AJU Poland

    Go to case study

    Hermes

    Go to case study

    Southco

    Go to case study

    Danfoss Tuchom

    Go to case study

    SanoRice

    Go to case study

    Panattoni

    Go to case study

    IdealAutomotive

    Go to case study

    LPP

    Go to case study
    1/1