
Auchan
The project incorporates Ocado technology, automated logistics, and three temperature zones, integrating process and facility requirements into one cohesive system.
Investor:
Auchan Retail Poland
Developer:
Panattoni Europe
Architecture:
TFK Poznań
General contractor:
GOLDBECK Poland
Location:
Wilcza Góra, Masovian Voivodeship
Total area:
18,000 m²
Scope of work:
architectural design, BIM coordination, coordination of Ocado's technological requirements, and detailed design

TFK was responsible for the architectural design, interdisciplinary coordination in a BIM environment, and the integration of Ocado's technological requirements with the building's solutions.
The project included:
automated Ocado fulfillment system
cold and freezer storage zones
mezzanines and automation infrastructure
the entire product journey — from delivery to order preparation and shipping
A modern, robotic e-grocery center for Auchan has been created, designed for Ocado technology and full end-to-end order fulfillment.
"A standard warehouse is just space for pallet racking. A robotic CFC is in a completely different league."

.png)
.png)











.jpg)
.png)

.jpg)
.jpg)


