  • Auchan



    The project incorporates Ocado technology, automated logistics, and three temperature zones, integrating process and facility requirements into one cohesive system.

  • Investor:
    Auchan Retail Poland
  • Developer:
    Panattoni Europe
  • Architecture:
    TFK Poznań
  • General contractor:
    GOLDBECK Poland
  • Location:
    Wilcza Góra, Masovian Voivodeship
  • Total area:
    18,000 m²
  • Scope of work:
    architectural design, BIM coordination, coordination of Ocado's technological requirements, and detailed design
  • TFK was responsible for the architectural design, interdisciplinary coordination in a BIM environment, and the integration of Ocado's technological requirements with the building's solutions.

    The project included:

  • automated Ocado fulfillment system
  • cold and freezer storage zones
  • mezzanines and automation infrastructure
  • the entire product journey — from delivery to order preparation and shipping
  • A modern, robotic e-grocery center for Auchan has been created, designed for Ocado technology and full end-to-end order fulfillment.
     

  • Obejrzyj cały film
    "A standard warehouse is just space for pallet racking. A robotic CFC is in a completely different league."
    Adrian Lipowski
    TFK Senior Architect and Development Team Manager.

    See our projects

    Elmark

    Go to case study

    Chefs Culinar

    Go to case study

    ELTEK

    Go to case study

    Panattoni dla DPD

    Go to case study

    Danfoss Grodzisk

    Go to case study

    B144 Biurowiec

    Go to case study

    BSH

    Go to case study

    City Point

    Go to case study

    Greenpack

    Go to case study

    Auro

    Go to case study

    AJU Poland

    Go to case study

    Hermes

    Go to case study

    Southco

    Go to case study

    Danfoss Tuchom

    Go to case study

    SanoRice

    Go to case study

    Panattoni

    Go to case study

    IdealAutomotive

    Go to case study

    LPP

    Go to case study
    1/1